摘要
结合工程概况,介绍了G210线K2027+070~K2027+150滑坡治理设计方案,重点阐述了抗滑桩配筋验算和上挡墙稳定验算的过程,验算结果表明,路基右侧35 m^200 m设抗滑桩进行综合治理的方法能满足设计要求。
Combined with practical work the design scheme for treatment of K2027 + 070--K2027 + 150 landslide along G210 line is introduced. The checking computation of reinforcement of anti-slide pile and stability of upper retaining wall are mainly discussed. Results show this comprehensive treatment method setting anti-slide pile along the right side of roadbed from 35 m to 200 m can meet stability requirements.
出处
《山西建筑》
2007年第29期125-126,共2页
Shanxi Architecture
关键词
滑坡
治理
设计方案
验算
landslide, treatment, design scheme, checking calculation