针对复杂的地质条件、技术难度较大、施工风险突出的工程特点,指出采用盾构法施工应当制定完善的施工方案,并对施工过程进行实时监测和动态管理,从而保证了掘进过程的安全平稳进行以及工具设备的经济有效使用。
As for complex geological conditions, with much difficulty and high risk in construction, careful planning should be made up for shield tunneling, and both real-time monitoring and dynamic management are necessary in the process. With the technical measures, the tunneling process can proceed safely and the equipment can be used economically and effectively.
出处
《山西建筑》
2007年第29期306-307,共2页
Shanxi Architecture
关键词
盾构法
软硬不均地层
工程难点
技术措施
shield tunneling, soft-hard interphase layer, engineering difficulty, technical measure