摘要
结合某连续刚构桥的高墩施工,简要介绍了影响桥墩垂直度的主要因素,分析了温度对连续刚构桥墩垂直度的影响,提出了施工中减小高大桥墩偏位的措施,从而达到控制桥墩垂直度的目的。
Combined with the high pier construction of a continuous bridge, it simply introduces the main factors which affect the vertical degree of bridge pier, and introduces temperature' s effects on vertical degree of continuous steel bridge pier, brings forward measures in reducing high and huge bridge pier's leaning in construction, so as to achieve the aim of controlling bridge pier's vertical degree.
出处
《山西建筑》
2007年第29期326-327,共2页
Shanxi Architecture
关键词
连续刚构
高大桥墩
温度
垂直度
continuous bridge, high and huge bridge pier, temperature, vertical degree