结合工程概况,介绍了隧道塌方的经过及施工情况,从地质、施工组织、施工质量三方面分析了隧道塌方的原因,并结合现场实际状况,制定了具体的塌方施工处理方案,以保证施工的顺利进行。
Combined with the general situation of project, it introduces the process and construction of tunnel collapse, analyzes reasons which caused tunnel collapse from three aspects including geology, constructing organization and constructing quality. Combined with on-spot actual condition, it makes concrete plans of constructing process, so as to ensure the favoring operation of construction.