摘要
江西新余发电有限责任公司两台200MW机组均采用中间储仓式制粉系统和16台GF-9型叶轮给粉机。自投产以来,给粉机一直下粉不均,风粉混合浓度波动很大,严重影响锅炉的安全、经济、稳定运行。通过运行分析对比,查出给粉机给粉量失控的原因,提出了合理的解决方案。
bin and feeder ball mill coal pulverizing systems is been employed at Jiangxi Xinyu thermal power plant. Since the system formally on production, jam of coal powder feeder and wind-powder consistency undulating severely happened often, it gave negative effect on boilor's running. Though comparison way, the reasons asked for feeder's control disorder been found clearly, and a reasonable solution way been put forward.
出处
《江西电力》
2007年第4期41-42,共2页
Jiangxi Electric Power
关键词
给粉机
制粉系统
粉仓
feeder
pulverizing system
bunker