文章针对500 kV肇花博输电线路工程中大型钢管塔组立施工方法,介绍了钢管塔的结构,施工基础设计及安装过程,叙述了采用内悬浮分解组立的方法。
The 500kV Zhao- hua - bo transmission line adopts large assembly method of steel - pipe- tower, introduces the structure, construction basis design and installation process of steel - pipe - tower, and expounds the decomposition assembly method of internal suspension.
出处
《青海电力》
2007年第3期21-23,共3页
Qinghai Electric Power
关键词
超高压输电线路
钢管塔
组立
施工工艺
EHV transmission line
steel - pipe - tower
assembly