期刊文献+

水库移民生产安置人口计算问题思考 被引量:7

On calculation of population with production resettlement of reservoir immigration
下载PDF
导出
摘要 根据不同水库淹没区存在的土地资源类型,结合不同地区移民工作的实践,提出了不同的生产安置人口的计算方法,并通过一个工程实例说明了其理由及差异。 The reservoir immigration is an unavoidable issue during the hydropower development.The rural resettlement is the key problem in reservoir immigration,and it includes production resettlement and house relocation.Among them the production resettlement is the most important.The prerequisite of production resettlement is to calculate the number of population with production resettlement,which means the allocation of the production resettlement task.The calculation of population with production resettlement is both the political and technological matter.Whether the calculation is reasonable or not will directly affect the implementation of reservoir immigration.In this paper,according to the types of farmland in reservoir inundation areas and through putting the resettlement practices in different areas into consideration,different calculation methods of production population are proposed,and the relative explanation is put forward based on a case study.
出处 《水利经济》 2007年第5期72-74,共3页 Journal of Economics of Water Resources
关键词 水库移民 生产安置 计算方法 折算耕地 reservoir immigration production resettlement calculation method conversion of farmland
  • 相关文献

参考文献3

二级参考文献3

  • 1刘肖珩,顾恒岳,尹红梅.移民环境容量有关问题的探讨[J].重庆环境科学,1995,17(1):35-39. 被引量:3
  • 2长江水利委员会.三峡工程移民研究[M].武汉:湖北科学技术出版社,1997.51.
  • 3孙阳 王里奥 袁辉 唐传利 施国庆主编.三峡库区环境人口容量探讨[A].唐传利,施国庆主编.移民与社会发展[C].南京:河海大学出版社,2002.541.

共引文献12

同被引文献35

引证文献7

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部