5WANG Qiusheng.Study on the application of the method of fuzzy comprehensive judgement for administration of engineering progress project of construction[J].Journal of Shanxi Agriculture University,2002,3(5):265-268(in Chinese).[王秋生.模糊综合评价法在建筑施工进度计划管理中的应用研究[J].山西农业大学学报,2002,3(5):265-268.]
7Boehm B.Software cost Estimation with COCOMOⅡ.Prentice hall,2002.
8Jorgensen M,Grimsmd S.How to Avoid Impact from Irrelevant and Misleading Information When Estimating Software Development Efrort,IEEE Software2008,(5/6):78-83.
9Jorgensen M.A Review of Studies on Expert Estimation of Software Development Effort.Journal of Systoms and Software,2004,70(1-2):37-60.
10Victor D.Dailyk Software Estimatingatthetask level-the Spectral approach,Project Control:Satisfying the Cuaomet.London:Proeeedings of ESCOM SCOPE.2001.