期刊文献+

并行工程模式下企业管理决策的几个问题及其求解 被引量:1

Some Problems of Enterprise Management and Decision Making in Concurrent Engineering and Their Solutions
下载PDF
导出
摘要 针对并行工程模式下企业管理决策的典型问题,建立一组以省时为优化目标的数学模型。这些模型能较好地表现并行工程哲理的并行性、约束性和协调性特征。讨论了模型的求解,并给出一个算例。 A set of mathematic models with a time-saving goal were built in the light of several typical prob-lems of enterprise management and decision making in concurrent engineering. The models to a certain extent embody the characteristics of the philosophy of concurrent engineering, that is, concurrence, constraints and coordination. The solutions of these models were discussed, and an illustrative example was given.
出处 《控制与决策》 EI CSCD 北大核心 1997年第3期234-238,共5页 Control and Decision
基金 863/CIMS主题 国家自然科学基金资助课题
关键词 并行工程 企业管理决策 最速运送模型 concurrent engineering, enterprise management and decision making, quickest transportation model, minmax algorithm
  • 相关文献

参考文献7

二级参考文献9

共引文献11

同被引文献10

  • 1王梦光,刘士新.资源受限工程调度问题的最新发展[J].控制与决策,1996,11(A01):105-112. 被引量:11
  • 2汪定伟 李莹.CIMS中经销与生产一体化管理系统的设计与开发.第四届中国计算机集成制造系统(CIMS)学术会议论文集[M].哈尔滨,1996,8..
  • 3潘家绍 刘丽文 等.现代生产管理学[M].北京:清华大学出版社,1994,2..
  • 4李必强,现代生产管理,1997年,5页
  • 5汪定伟,第四届中国计算机集成制造系统(CIMS)学术会议论文集,1996年,8页
  • 6王梦光,控制与决策,1996年,增刊,105页
  • 7陈荣秋,生产计划与控制,1995年,7页
  • 8汪星明,现代生产管理,1995年,3页
  • 9潘家轺,现代生产管理学,1994年,2页
  • 10汪定伟.交货期协商器及其滚动式生产计划方法[J].自动化学报,1998,24(6):776-779. 被引量:4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部