期刊文献+

集镇污水处理厂CAST工艺调试实验 被引量:1

Pilot Scale Study on CAST for Urban Wastewater Treatment Plant
下载PDF
导出
摘要 进行了集镇污水处理厂CAST工艺调试实验研究,实际调控结果表明,采用控制温度、溶解氧、沉降比、污泥指数、生物相的变化,运行周期4.5h,沉降比35%,污泥龄15d,生物区溶解氧31mg/L,实现生物菌种培养与驯化最佳条件,污泥浓度可达到2000mg/L,生物相基本稳定,处理效果显著,出水各项指标达标。 Pilot scale study of cyclic activated sludge technology (CAST) for urban wastewater treatment plant was undertaken,and results indicated that under operation period of 4.5h,precipitation ratio of 35%,sludge age of 15d,DO 31mg/L,best conditions of bacteria culture and domestication were obtained,with sludge concentration up to 2,000mg/L,stability of biological phase,efficient treatment and various effluent indicators satisfactory to criteria.
出处 《环境科学与技术》 CAS CSCD 北大核心 2007年第10期82-85,共4页 Environmental Science & Technology
关键词 污水处理 CAST工艺 调试实验 wastewater treatment cyclic activated sludge technology (CAST) pilot scale study
  • 相关文献

参考文献4

  • 1Namguk Hera, Gary Amya, Hyoung-Ryun Parkb, et al. Characterizing algogenic organic matter (AOM) and evaluating associated NF membrane fouling[J]. Water Research,2004, 38:1427-1438.
  • 2Gwmar Demoulin, Ylervyn C Goronszy, Konmd Wutscher, et al. Co-Current nitrification/dentrificauon and biological P-removal in cyclic activated sludge plants by redox controlled cycle operation[J].Wat Sci Tech,1997,35(1): 215-224.
  • 3Vaishnavi Sarathy, Herbert E Allen. Rapid communication copper complexation by dissolved organic matter from surface water and wastewater effuent [J]. Ecotoxicology and Environmental Safety, 2005,61: 337-344.
  • 4王宝贞,王琳.水污染治理新技术[M].北京:科学出版社,2003:40~41.

共引文献5

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部