期刊文献+

沙河抽水蓄能电站管理模式的探索和实践

Exploration and Practice of the Management Mode of Shahe Pumped-storage Power Station
下载PDF
导出
摘要 沙河电站是江苏电网第一座抽水蓄能电站,为将它管理成为一流的抽水蓄能电站,实现电站的安全稳定运行,需要创新管理模式,并以建设创新型、效益型、环保型沙河电站为奋斗目标,全面提高沙河电站生产运营的管理水平。沙河电站在生产管理模式、人力资源管理模式等方面进行了有益的探索。 As the first pumped-storage power station in the Jiangsu power grid, it will be built and managed into a class-1 station. In order to ensure its safe and stable operation, an innovation management mode is needed. The management level in the production and operation of Shahe Pumped-storage Power Station will be fully enhanced by the goal to build Shahe power station into innovative, profitable and environmental enterprise. Some useful explorations have been made in the management mode of production and human resources in the Shahe power station.
作者 蒋德福
出处 《水力发电》 北大核心 2007年第9期55-56,共2页 Water Power
关键词 管理模式 设备管理 安全管理 人力资源管理 沙河抽水蓄能电站 management mode management of equipment management of safety management of human resources Sha- he Pumped-storage Power Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部