沙河电站上库大坝混凝土面板裂缝原因分析和处理 被引量:3

Cause Analysis and Treatment of the Cracks of Concrete Facing Slab of the Upper Reservoir Dam of Shahe Pumped-storage Power Station
下载PDF
导出
摘要 沙河抽水蓄能电站运行已五年。在2005年检查时发现大坝混凝土面板出现了若干裂缝,经过认真分析,确定采用灌浆和SR止水材料的处理措施,于2006年进行了处理。2007年4月对面板进行了复查,处理效果良好,满足裂缝封闭和防止裂缝继续开展的要求。 After 5-year operation of Shahe Pumped-storage Power Station, we found several cracks on the concrete facing slab in the overhaul in 2005. By careful analysis, we determined to adopt the treatment by grouting and laying on SR sealant, which was done in 2006. We re-checked the facing slab in April 2007 and found out its treatment result is good and it met the requirements of closing the cracks and preventing the crack development again.
出处 《水力发电》 北大核心 2007年第9期67-68,共2页 Water Power
关键词 混凝土面板 裂缝 原因分析 处理措施 沙河抽水蓄能电站 concrete facing slab crack cause analysis treatment measure Shahe Pumped-storage Power Station
  • 相关文献

参考文献1

  • 1上海勘测设计研究院.江苏沙河抽水蓄能电站东副坝运行期安全监测资料分析与面板裂缝处理[R].2006.

同被引文献22

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部