期刊文献+

水库地震主震发生时间的预测 被引量:7

PREDICTION ABOUT THE MAINSHOCK ORIGIN TIME OF RESERVOIR EARTHQUAKE
下载PDF
导出
摘要 水利工程对水库地震的抗震设防要求事先对水库地震进行预测。预测内容包括蓄水后诱发地震的危险性(可能性)、最大震级、最大震的地点、发生时间以及水库地震对场址地震动参数的影响等。除主震时间的预测外,本文第一作者都曾提出过初步的预测方法[1]。本文认为,水库地震前震波速比异常、非线性灰色模型以及前震系列回归等方法,是预测主震时间的有前途的方法。 Reservoir earthquake predicting is required to do a priori by earthquake resistance protection of water conservancy works against reservoir earthquake. The predicting contents include the risk (probability) of induced earthquake after impoundment, maximum magnitude, location and origin time of the mainshock and influence of the earthquake on seismic dynamic parameters etc. The methods of foreshock Vp/Vs ratio anomaly of reservoir earthquake, nonlinear grey system, and foreshock sequence regression etc are considered as those of having a future on the prediction of mainshock origin time.
机构地区 广东省地震局
出处 《华南地震》 1997年第2期76-82,共7页 South China Journal of Seismology
关键词 水库诱发地震 发震时刻 预测法 地震工程 Reservoir induced earthquake, Origin time, Prediction method
  • 相关文献

参考文献3

二级参考文献8

共引文献150

同被引文献112

引证文献7

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部