期刊文献+

天桥水电站扩泄除险方案分析 被引量:2

Schemes Analysis of Extending Flux for Wiping off Danger of Tianqiao Hydropower Station
下载PDF
导出
摘要 天桥水电站工程地质和水文地质条件非常复杂,在考虑原建筑物布置和地形地质条件的情况下,选择了新增泄洪建筑物的位置,且在考虑工程投资、电厂运行管理、新增建筑物进流条件、弃水量及泄洪排沙等因素的情况下,推荐了几种扩泄除险方案,并进行了方案之间的比较,从中选取了最优方案,达到了提高防洪标准的目的. Tianqiao Hydropower Station's geology of engineering and hydrology are very complex. Considering the location of the old building and the terrain & geology conditions, the locations of new extending flux building are selected, and considering the investment of this engineering,the power station running management, the conditions of new building entering flow,the abandoning,water' s quantity,flood discharging and draining off sand, and so on, several schemes of extanding flux for wiping off danger are recommended, and comparing with these schemes,the most optimizative scheme is chosen in the end. this design is valuable for the other engineering of extending flux for wiping off danger.
出处 《华北水利水电学院学报》 2007年第5期20-22,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 扩泄除险 建筑物布置 方案比较 天桥水电站 wipe off danger lay of building scheme comparing Tianqiao Hydropower Station
  • 相关文献

参考文献3

  • 1水利部山西水利水电勘测设计研究院.黄河天桥水电站大坝安全鉴定报告[R].北京:水利部,2002.
  • 2天桥水电站指挥部.天桥水电站施工总结报告[R].郑州:天桥水电站指挥部,1980.
  • 3黄河勘测规划设计有限公司.山西天桥水电站除险加固工程初步设计报告[R].郑州:天桥水电站指挥部,2005.

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部