1Soren Degn Eskesen, Per Tengborg, Jorgen Kampmann, Trine Holst Veicherts , Guidelines for Tunneling Risk Management: International Tunneling Association Working Group,Tunnelling and Underground Space Technology, 2004,19 (2):217-237.
3Mohamm ad A Mustafa, Jam al F A I--Bahar. Project Risk Assessment Using the Analytic. Hieraachy Process [J]. IEEE Transactions on Engineering Management, 1991, 38(1) :46-52.
4许柏树.层次分析法原理[M].天津:天津大学出版社,1988..
二级参考文献5
1Mohamm ad A Mustafa,Jam al F A I-Bahar.Project risk assessment using the analytic hierarchy process[J].IEEE Transactions on Engineering Management,1991,38 (1):46-52.
2Prasanta Dey,Mario T Tabucanon,Stephen O Ogunlana.Planning for project control through risk analysis:a petroleum pipeline-laying project[J].International Journal of Project Management,1994,12(1):23-33.