南水北调中线水源工程丹江口水力发电厂机电设备改造

Transformation of Electromechanical Device of Danjiangkou Hydropower Station in Water Sources Project Water Sources Project of the Middle-Route Project of South-to-North Water Transfer
下载PDF
导出
摘要 南水北调中线水源工程丹江口水力发电厂机电设备改造项目已进入实施阶段。对电厂机电设备改造的范围、内容、进度安排进行了介绍,对直接指定汉江集团作为安装单位的原因进行了阐述,对设备改造过程中存在的工作难点和技术难题进行了分析。 Transformation of electromechanical device of Danjiangkou Hydropower station has already been implemented. The paper introduces the scope, content, progress arrangement of the transformation works and elaborates the reason of directly assigning the transformation works to Hanjiang Hydropower (group) Co. Ltd, and analyzes the working difficulties and the technical difficult problem in the process of the transformation works.
出处 《南水北调与水利科技》 CAS CSCD 2007年第5期22-25,34,共5页 South-to-North Water Transfers and Water Science & Technology
关键词 丹江口水力发电厂 机电设备 改造 Danjiangkou Hydro-power station electromechanical device transformation
  • 相关文献

参考文献1

  • 1[1]丹江口水利枢纽大坝加高工程初步设计报告(修订本)[R].长江水利委员会长江勘测规划设计研究院,2004.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部