南水北调东线淮安四站输水河道穿湖段工程实施方案优化 被引量:1

Implemental Scheme Optimization on the Water Transferring Canal of Huai'an No.4 Pumping Station,Eastern Route of the South-to-North Water Diversion
下载PDF
导出
摘要 通过对南水北调东线第一期工程淮安四站输水河道穿湖段工程优化实施方案的分析,提出在湖泊中建设水利工程需注意的施工工期、施工风险、实施方案、投资控制等问题,对今后类似工程的设计和施工可以起到参考和借鉴作用。 The article analyzes the implementation scheme of The Huairan No, 4 pumping station and its water transferring canal on many aspects such as the river-lake connection scheme, scheme optimization on construction, risk controlling during construction, structure of spillage weir, general layout, etc. Also points out the problems that must be paid attention during the implementation of hydraulic structures such as construction period, construction risk, implementation scheme, cost controlling, etc, which can be the guidance for future design and implementation on similar projects,
出处 《南水北调与水利科技》 CAS CSCD 2007年第5期26-27,38,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 输水河道 实施方案 优化 South-to-North water diversion water transferring canal implementation scheme optimization
  • 相关文献

参考文献2

  • 1[1]江苏省水利勘测设计研究院有限公司.南水北调东线第一期工程长江-骆马湖段2003年度工程淮安四站输水河道工程初步设计[R].扬州:江苏省水利勘测设计研究院有限公司,2004.
  • 2[2]江苏省水利勘测设计研究院有限公司.南水北调东线第一期工程淮安四站输水河道工程淮安实施段(运西河6+000~新河+1005)招标设计[R].扬州:江苏省水利勘测没计研究院有限公司,2006.

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部