750kV输变电示范工程网损分析 被引量:2

North West 750 kV Power Grid Transmission Lost Analysis
下载PDF
导出
摘要 对国家电网公司750kV输变电示范工程2006年1月至2007年6月期间损耗电量及损耗率进行了统计,分析了其构成及变化特征.指出在电量计量方面可能存在超标误差,导致750kV官亭变向兰州东变输送电量时出现零损,甚至负损;分析了750kV输电线路在运行初期输送功率较低的情况下,输送电量与线路损耗率之间的关系曲线,推算出使750kV输电线路损耗率最低的运行电流(功率)。 North west 750 kV power grid is the first 750 kV power project in China, which is installed in Sep.2005. During the initial operation stages of north west 750 kV power grid, because of low transmission power, the lost is much higher than normal. The paper analyzes each part loss of 750 kV power grid, it includes transformer, shunt reactor, transmission conduct and substation loss. The conclusion can be drawn that transnormal errors maybe occur among measurement instruments, and the economic transmission power can make grid loss lowest.
作者 于峥 柯贤波 王蒙 YU Zheng, KE Xian-bo, WANG Meng (North West China Grid Company Limited, Xi'an 710048, Shaanxi Province, China)
出处 《电网与水力发电进展》 2007年第6期15-21,共7页
关键词 750 KV输变电工程 电量损耗 损耗率 750 kV Power gird Power energy Lost
  • 相关文献

同被引文献9

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部