摘要
通过对一高速公路特大桥工程连续箱梁现浇施工,介绍了重型门式满堂模板支架构架设计计算与承载能力验算、支架搭设施工工艺及施工过程控制的一种适用方法。
The box beams in a road bridge are cast under the support of full framing. Steps such as framing design computation, check analysis of bearing capacity, framing construction and ways of construction control, in the construction of the heavy portal full framing falsework are introduced.
出处
《安徽建筑》
2007年第5期108-110,113,共4页
Anhui Architecture
关键词
重型门式支架
构架设计
搭设施工
稳定性
验算分析
portal falsework
framing design
framing construction
stability
check analysis