摘要
本文介绍了凉山矿业淌塘铜矿自投产运行以来,针对该碳质脉石型铜矿生产技术经济指标偏低的现实,在生产过程中分别进行了磨矿-浮选工艺流程和药剂制度的改进,获得铜精矿含铜22%,铜回收率82%,球磨机台效22吨/时。该工艺流程和药剂制度合理,效果显著。
The Liang Shan mining industry the main body of a book has been introduced prips with the pond copper mine since oneself puts operation into production in commission, Specifically for owing a carbonaceous gangue the type copper mine technology, the economic target is partial to low reality, Have carried out the improvement grinding the ore flotation rpocess flow and medicament system respectively in procedure of production, Gain ghe copper selected mine containing copper 22 %, copper coefficient of recovery 82 %, when the ball mill platform imitates 22 tons. Be the process flow and medicament system turn to be very effective rationally.
出处
《四川有色金属》
2007年第3期22-24,28,共4页
Sichuan Nonferrous Metals
关键词
碳质脉石铜矿
流程改进
药剂制度
品位
回收率
Carbonaceous gangue copper mine
Technological process is improved
Medicament system
grade
Coefficient of recovery