期刊文献+

基于可靠度的下一代桥梁管理系统 被引量:1

The Next-Generation Bridge Management System Based on Reliability
下载PDF
导出
摘要 通过对桥梁管理系统发展历程的回顾、对其现状的考察和对其未来的预测,发现目前的桥梁管理系统存在缺陷,这些缺陷能够通过一种基于可靠度的桥梁管理方法予以克服。研究了这种方法的基本理念、桥梁可靠度状态和影响桥梁全寿命过程的不确定性因素等。 Via reviewing the past of bridge management systems, examining their present, and forecasting their future, it is found that current bridge management systems based on condition states have limitations, and that these limitations can be overcome by using a new bridge management approach based on reliability. Basic concepts of the approach, such as reliability states, influence of uncertainties on bridge reliability, are discussed.
出处 《建筑管理现代化》 2007年第4期57-59,共3页 Construction Management Modernization
关键词 下一代 桥梁管理系统 可靠度 桥梁维修 next generation bridge management systems reliability Brige maintenance
  • 相关文献

参考文献6

  • 1Liu M,Frangopol D M.Time-Dependent Bridge Network Reliability:Novel Approach[].Journal of Structural Engineering ASCE.2005
  • 2L.C.Neves,,D.M.Frangopol.Condition,Safety and Cost Profiles for Deteriorating Structures with Emphasis on Bridges[].Reliability Engineering and System Safety.2005
  • 3D.Singh,Robert L.K.Tiong.Development of Life Cycle Costing Framework for Highway Bridges in Myanmar[].International Journal of Project Management.2005
  • 4R.E.Minchin Jr,T.Zayed,A.J.Boyd,M.Mendoza.Best Practices of Bridge System Management A Synthesis[].Journal of Management.2006
  • 5A.C.Berg,L.C.Bank,M.G.Oliva,J.S.Russell.Construction and Cost Analysis of an FRP Reinforced Concrete Bridge Deck[].Construction and Building Materials.2006
  • 6Lu&#xed,s C. Neves Dan M. Frangopol and Paulo S. Cruz.Cost of life extension of deteriorating structures under reliability-based maintenance[].Computers and Structures.2004

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部