双悬臂式结构闸室施工期的稳定计算

Calculation of Stability for Construction Period of Double-cantilever Structural Gate Chamber
下载PDF
导出
摘要 钢筋混凝土双悬臂式结构闸室自重轻、造价省、应用广泛,但在施工期回填土某段时间内地下水的浮托力可能超过结构自重加回填土压重;或是地下水的倾覆力矩超过闸室墙后水土压力的平衡力矩,从而导致整个闸室结构的破坏。因此,必须进行施工期的稳定计算,并采取相应压重措施以确保闸室结构施工期的安全。 For the steel reinforced concrete double-cantilever structural gate chamber, its self-weight is light, its construction cost is saved and its application is widely, but the floating power of underwater in some section of time when the backfilling of the construction period maybe exceed the self-weight of structure plus the pressure weight of backfilling or the overturning moment of underwater will exceed the balancing moment of water and soil pressure at the back of gate chamber wall so as to result in damaging the whole gate chamber structure. Therefore, it must be to carry out the stability calculation of construction period, and the relative weighting measures are taken to ensure the safety for the construction period of the gate chamber structure.
出处 《城市道桥与防洪》 2007年第8期75-77,共3页 Urban Roads Bridges & Flood Control
关键词 双悬臂式 闸室 施工期 稳定 压重 double-cantilever, gate chamber, construction period, stability, weighting
  • 相关文献

参考文献3

  • 1[2]SL 265-2001,水闸设计规范[S].
  • 2[2]SL 27-91,水闸施工规范[S].
  • 3[3]SDL 338-89,水利水电工程施工组织设计规范[S].

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部