摘要 论述了在100MW机组电站锅炉所作的低负荷水循环试验。试验的主要目的是检验在低负荷运行时水循环的可靠性。试验结果表明:70%以上电负荷运行不会出现水循环问题;50%电负荷滑压运行,也不会出现水循环问题;50%电负荷定压运行则水循环可靠性较差,不宜长期运行;40%电负荷不宜运行。 Water circulation reliability tests were held at low loads in a 100MW utility set's boiler.The aim of the tests was to verify the water circulation reliability of low loads during cycling service.The test results show that no water circulation problem will arise when the power load is above 70% rated load as well as at 50% power load under gliding pressure operations.A lowering of water circulation reliability will result when the power load is at 50% rated load under constant pressure operations making it unsuitable for long-term operation.It is unsuitable for normal operation at 40% rated power load in addition.
出处 《东北电力学院学报》 1997年第1期1-7,共7页 Journal of Northeast China Institute of Electric Power Engineering
关键词 锅炉 水循环 低负荷 可靠性 发电厂 试验 power station boiler,water circulation,low load,reliability
  • 相关文献

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部