摘要
萧围东线治江围涂工程第一期(试验期)工程,通过科学的安排,有序的组织,合理的调度,充分挖掘现有施工力量,处理了在钱塘江强涌潮、低河床、紧临深江区域施工的二个关键问题.一是攻克了在强涌潮顶冲地段进行深水抛坝的难题;二是同样在强涌潮顶冲地段完成龙口封堵和土方闭气施工.
The first stage of Xiaoshan Reclamation Engineering solved the two key problems in Qiantangjiang strong tide area with low river-bed which is always near deep-water region: one is deep water jackstone in strong tide rush area; the other is gap closure and earthwork water tight. The successful practice is realized based on scientific arrangement, proper administration and reasonable adjustment.
出处
《浙江水利水电专科学校学报》
2007年第3期35-36,43,共3页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
强涌潮
促淤丁坝
土方闭气
strong tide
silt promotion spur
earthwork water tight