目标函数是最大延误的数学期望的单机随机调度问题 被引量:2

Stochastic Single Machine Scheduling to Minimize the Expectation of Maximum Tardiness
下载PDF
导出
摘要 在任务的加工时间和工期是相互独立的随机变量的情况下研究单机随机排序问题,目标函数为最大延误的数学期望。通过理论分析,给出了该问题的不可中断静态优先策略,并通过实例验证。 The stochastic scheduling on a single machine is discussed to minimize the expectation of maximum tardiness with random processing times and due dates.The non-preemptive static list policy of the priority can be given by theoretical analysis and the algorithm is verified by the example.
作者 薛瑞红 李扬
机构地区 沈阳化工学院
出处 《科学技术与工程》 2007年第21期5643-5644,共2页 Science Technology and Engineering
关键词 单机 随机排序 最大延误 优先策略 single machine stochastic scheduling maximum tardiness priority policy
  • 相关文献

参考文献3

  • 1[1]Jackson J R.Scheduling a production line to minimize maximum tardiness.Research Report 43,Management Sci Res Project,UCLA,1955
  • 2[2]Lageweg B J,Lenstra J K,Rinnooy Kan A H G.Minimizing maximum lateness on one machine:Computational experience and some applications.Statist Neerlandica,1976 ;30 ;25-41
  • 3[3]Dempster M A H,Lenstra J K,Rinnooy Ken A H G.Deterministic and stochastic scheduling,Holland/Boston/London:D.Reidel Publishing Company,1982