新型钢管混凝土不穿心节点静载试验研究 被引量:2

Static Experimental Study on New Type Non-through-core Concrete-filled Steel Tube Connection
下载PDF
导出
摘要 基于钢管混凝土柱与钢筋混凝土密肋扁梁连接的新型不穿心节点型式,进行了典型节点的静载试验。介绍了试验方案、试件制作、加荷方式、试件的裂缝发展情况及破坏形态等。试验结果表明,新型节点整体上设计合理,传力明确,易于施工;在高层建筑中新型节点可极大降低节点区空间,具有良好的安全和经济性。 Based on presented novel non-through-core concrete-filled steel tubular connection with flat beams with dense ribs, static experiments on typical connections have been fulfilled. The experimental scheme, fabrication of specimens, loading system, development of cracks and failure models are described. Experimental results show that the design of the novel connection is reasonable, force transmission is clear and it is easy to be constructed. The usage of the novel connection will reduce the space around connection, thus it's economical for the high-rise building to adopt the novel connection.
出处 《建筑结构》 CSCD 北大核心 2007年第9期118-122,85,共6页 Building Structure
关键词 高层建筑 钢管混凝土柱 不穿心节点 静载试验 high-rise building concrete filled tubular column non-through-core connection static experiment
  • 相关文献

参考文献7

  • 1胡狄.广州港湾广场一期工程钢管混凝土柱节点试验研究报告[R].中南大学,2006.
  • 2蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003..
  • 3JGJ3-2002.高层建筑混凝土结构技术规程[S].[S].,..
  • 4GB50017--2003.钢结构设计规范[S].[S].,..
  • 5钢骨混凝土结构设计规程(YB9082--97)[S].
  • 6CECS28:90.钢管混凝土结构设计与施工规程[S].[S].,1990..
  • 7GB50010--2002.混凝土结构设计规范[S].[S].,..

共引文献1533

同被引文献27

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部