摘要 在以火力发电机组为主的电网中,为满足黑启动需要所预留水量的大小直接影响抽水蓄能电站的削峰填谷效益。为使抽水蓄能电站的综合效益最大,提出了抽水蓄能电站的黑启动效益及黑启动所需水量的计算方法。综合考虑抽水蓄能电站的黑启动效益和静态效益,结合削峰填谷的边际运行位置约束,建立了抽水蓄能电站最优预留水量计算模型。以山东电网为例说明了该模型和算法的合理性。 In a power grid mainly relying on the thermal generator set, the reserve water used to meet the needs of black start has a direct impact on the benefits of peak load shifting. In order to get the largest benefits of the pumped storage power station, the calculating method for black-start benefits and the required water of black-start are proposed. Considering the black-start benefits of the pumped storage power station, static benefits and the constraint of the marginal running position, the calculation model for optimal reserve water is developed. Simulation results of Shandong power grid in China show that the model and method proposed are effective.
出处 《电力系统自动化》 EI CSCD 北大核心 2007年第19期32-37,共6页 Automation of Electric Power Systems
关键词 黑启动 抽水蓄能电站 最优预留水量 black-start pumped storage power station optimal reserve water
  • 相关文献

参考文献13

二级参考文献52

共引文献135

同被引文献96

引证文献7

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部