叙述了长兴电厂4×300MW燃煤机组湿法烟气脱硫工程的总体设计、工艺过程,分析了该工程在调试及运行阶段所出现的问题并提出相应的解决办法,对调试过程中所获得的数据进行了系统分析。
The overall design and technical process of FGD project of 4 ×300 MW units in Changxing Power Plant are introduced, Some problems existed in system debugging and operation are analyzed and corresponding solutions are put forward. The experimental data obtained from the system debugging are studied in detail.
出处
《电力环境保护》
2007年第5期27-29,共3页
Electric Power Environmental Protection
关键词
烟气
SO2
FGD
flue gas
sulfur dioxide
flue gas desulfurization