期刊文献+

大红山选矿厂中间矿仓支承方案的确定

Determination of supporting scheme of surge silo for Dahongshan concentrator
下载PDF
导出
摘要 简介了大红山选矿厂中间矿仓施工图设计方案;阐述了圆筒仓支承与仓底板、基础形式的关系;强调了在设计时,要与工艺专业协商,以达到合理的结构;同时,要考虑工程造价等因素。 The Working drawing scheme of surge silo of Dahongshan concentrator was introduced in brief, the relationship between the silo support, the silo base and the foundation type was described. The author has pointed out that it is necessary to negotiate with the process engineers to rationalize the silo structure, and such fators as the construction costs, etc. should be considered in the design stage.
作者 李小肃
出处 《冶金矿山设计与建设》 1997年第2期34-37,50,共5页 Metal Mine Design & Construction
关键词 圆筒仓 支承结构 选矿厂 矿仓 Silo Supporting structure Concentrator
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部