主要基于铁路第六次提速京哈线哈兰段接触网设备硬点整治,通过数据对比分析,提出了硬点产生的原因和对硬点整治一些措施。
On basis of hard point elimination of OCS equipment in Harbin-Lanling of Beijing-Harbin line in the 6^th speed raising of railway in large scale, and by comparison and analysis of data, puts forward the causes of hard points and measures on elimination of them.
出处
《电气化铁道》
2007年第5期28-29,共2页
Electric Railway
关键词
既有线
提速
接触网
硬点
existing line
speed raising
OCS
hard-point