摘要
该文以上海市污水治理三期工程UWW1.4A标工程为实例,全面介绍了大口径长距离蛇行曲线顶管的施工情况,并对大口径长距离蛇行曲线顶管的技术措施做了详细阐述。
Taking UWW1.4A Bid Project of Shanghai Sewage Harnessing Phase Ⅲ Project as a practical example,the article fully introduces the construction conditions of the large-caliber long-distance snake curve pipe jacking,and sets forth in detail the technical measures for the large-caliber long-distance snake curve pipe jacking.
出处
《城市道桥与防洪》
2007年第9期74-79,共6页
Urban Roads Bridges & Flood Control
关键词
大口径长距离蛇行曲线顶管
施工技术
顶力控制
沉降控制
large-caliber long-distance snake curve pipe jacking,construction technique,jacking control,sedimentation control