4Donald S Barrie & Boyd C Paulson, Jr. Professional construction management including CM, design-construction and general contracting, Third edition, McGraw-Hill Inc, 1992.
5Harold Kerzner. Project management: a system approach to planning, scheduling and controlling, International Thomson Publishing Inc, 1995.
6Moore David R., Dainty Andrew R. J. ,Intra-team boundaries as inhibitors of performance improvement in UK design and build proiects: a call for change,Construction Management and Economics,19(2001)
7Williams Gareth Vaughan, Fast Track Pros and Cons: Considerations for Industrial Projects, Journal of Management in Engineering (ASCE), 1995 (5)
8Tenah Kwaku A., The Design-Build Approach: An Overview, Cost Engineering,2000 (3)
9Chege Lucy W., Rwelamila Pantaleo D. , Private Financing of Construction Projects and Procurement Systems: An Integrated Approach, CIB World Building Congress, New Zealand, 2001
10Ibbs C. William, et al, Proiect Delivery Systems and Prolect Change: Quantitative Analysis, Journal of Construction Engineering and Management (ASCE), 2003(4)