摘要
白龙港城市污水处理厂工程分为升级改造工程、扩建工程和污泥处理工程等多个子项,水处理工程规模将达到200万m3/d,污水经处理后达到国家规定的排放标准排放。通过方案论证比较,该工程采用多模式AAO处理工艺和集约化组团式布置,力争打造一座国际先进的城市污水处理厂。
Shanghai Bailonggang Urban Sewage Treatment Plant Program, whose sewage treatment capacity will reach to 2 million m^3/d, was divided into several sub-program such as upgrade, expansion and sewage treatment etc. Treated sewage will reach to the state urban sewage emission standard. Through argumentation and comparison to various schemes AAO multi-mode treatment process and intensive arrangement is applied for this project to make attempt to set up a advanced international level urban sewage treatmnet plant.
出处
《上海建设科技》
2007年第5期11-14,共4页
Shanghai Construction Science & Technology
关键词
污水处理
工程设计
多模式AAO工艺
sewage treatment
engineering design
AAO multi-mode treatment process