摘要 根据招徕河薄碾压混凝土双曲拱坝的施工安排,采用三维有限元仿真计算方法,对比分析了拱坝在无温控措施、有预冷措施、有预冷+一期通水冷却措施、预冷+一期通水冷却+保温板措施等四种工况下的温度场和应力场的变化情况,其计算分析成果,可供薄碾压混凝土拱坝温控设计参考。 Based on the scheduled construction of the Zhaolaihe river thin RCC double - curvature arch dam, the 3D FEM is used to simulate and calculate the temperature field and stress field during construction. A comparison is made among the measures of dam concrete placement temperature control under 4 working conditions, i. e. without temperature control, with pre - cooling, with pre - cooling + cooling water pipes, and with cooling water pipes + insulating polystyrene plates. The calculation and analysis results can serve as a reference for temperature control design of a RCC arch dam.
出处 《云南水力发电》 2007年第5期35-38,63,共5页 Yunnan Water Power
关键词 碾压混凝土拱坝 温度场 温度应力 浇筑温度 温控措施 仿真分析 RCC arch dam temperature field temperature stress placement temperature temperature control measures simulative computation.
  • 相关文献

参考文献4

二级参考文献11

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部