苏通大桥辅桥268m连续刚构桥预应力施工 被引量:3

Construction of Prestressing of 268-m Span Continuous Rigid-Frame Structure of Auxiliary Bridge of Sutong Bridge
下载PDF
导出
摘要 对于预应力混凝土桥梁,预应力施工质量控制尤其重要,关系到结构安全和结构的耐久性。介绍苏通大桥辅桥纵向预应力的施工质量控制,对孔道的成孔定位、预应力张拉和孔道压浆等关键施工工序进行了较详细的描述,为今后同类桥梁的预应力施工提供借鉴。 For a prestressed concrete bridge, the quality control of prestressing construction is particularly important and is even of vital importance to the safety and durability of the structure. In this paper, the quality control of the longitudinal prestressing construction of the auxiliary bridge of Sutong Bridge is introduced and the key construction procedures of the prestressing duct positioning, prestress jacking and prestressing duct grouting thereof are presented in considerable details for reference to the construction of prestressing of similar bridges in the future.
作者 周新亚
出处 《桥梁建设》 EI CSCD 北大核心 2007年第A02期31-35,共5页 Bridge Construction
关键词 刚构桥 预应力 压浆 施工工艺 rigid-frame bridge prestressing grouting construction technology
  • 相关文献

同被引文献8

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部