摘要
通过对小湾水电站边坡锚固试验,解决了边坡锚索施工中遇到的技术难题。所取得的锚索成孔、灌浆、堵漏、锚索型式及其应用范围等成果,对复杂地质条件下大型工程的锚索施工具有一定的指导意义。
The technical problems in anchor cable engineering at side slope are solved through side slope anchorage test for Xiaowan Hydropower Station. The results related to anchor cable core forming, grouting, leakage stoppage, anchor cable type and application scope may guide the anchor cable engineering for large projects constructed under complicated geological conditions.