要加强造价管理,提高投资效益,必须全面实现"量"与"价"的分离。设计阶段是造价确定与投资控制最重要阶段,要想在设计阶段控制工程造价,就一定要在设计阶段进行设计招投标和设计方案的竞选,并对备选方案及技术经济进行优化和评价,真正达到以最优的设计、最经济的投资,建造最好的工程项目的目的。
To strengthen cost management, enhance investment benefit, it should separate "quantity" and "price" in an all-round way. The design stage is the most important period for the cost determination and the investment controlling. To control engineering cost in the design stage, there should be a competition for bidding of design plans in the design stage. And then alternative plans and technical and economic indexes are optimized and evaluated so as to achieve optimum design, reasonable investment and best project.
出处
《冶金动力》
2007年第5期83-84,88,共3页
Metallurgical Power
关键词
工程造价
管理
投资
设计阶段
engineering cost
management
investment
design stage