摘要
提出了完善的组织体系是施工成本管理的前提,强调了编制企业定额和原始记录的重要性,从工期、人员工资、材料成本、机械费、工程索赔等方面介绍了施工成本控制的措施,从而达到提高企业经济效益的目的。
It brings forward the perfect organization system is the precondition of the construction cost management, emphasizes the importance of the establish norm of enterprise and the original inventory, and introduces the construction cost measures from the aspects of time limit for project, wage, material cost, machine cost, project claim, which will increase the economical benefits.
出处
《山西建筑》
2007年第31期248-249,共2页
Shanxi Architecture
关键词
工程项目
成本控制
施工
索赔
project item, cost control, construction, claim