摘要
结合东藩运河大桥工程概况,详细介绍了主桥连续箱梁0号块的施工和连续箱梁1号~12号块段的悬臂浇筑施工,并探讨了箱梁悬臂施工测量办法和挠度控制,最后简述了合拢段的施工,具有一定的参考价值。
Combined with the general situation of Dongfan Canal bridge project, it introduces the construction of Block 0 main bridge continuous pile and the suspended pouring construction of Block 1 -12 continuous pile. It also discusses the suspended constructing measuring method and flexibility control. Finally, it elaborates the construction of jointed section, which has a certain refering value.
出处
《山西建筑》
2007年第31期326-327,共2页
Shanxi Architecture
关键词
主桥
连续箱梁
挂篮施工
混凝土
main bridge, continuous pile, basket-suspended construction, concrete