摘要
通过分析某水电站左岸谷肩堆积体监测成果,在前期的支护措施下,经过削坡开挖、原赋存环境改变后堆积体削坡区的稳定性做出评价;同时对前期的支护措施做出评价,并对以后的支护治理措施提出建议,指出工程建设中信息化设计与施工的重要性。
By analyzing the left bank of a hydropower station shoulder deposit rock monitoring results, makes valuation to stability cutting slope area under measure, process cutting slope working , the original environmentalchanging and in shoring the earlier stage. The shoring measure to the earlier stage makes valuation at the same time, analyses achievement governing measure to shoring in the hereafter putting forward a proposal combining with and current monitoring, significance suggesting that engineering construction is hit by informatization design and being under construction,
出处
《山西建筑》
2007年第31期354-355,共2页
Shanxi Architecture
关键词
堆积体
稳定性
监测分析
deposit rock, stability, monitoring and amalyzing