根据施工中坞墙位移的监测资料和控制经验,分别从设计结构和施工工艺方面分析拉锚式干船坞工程的坞墙位移的形成原因,并对有关结构设计和施工工艺的改进作探讨。
Based on the construction experiences and survey data of displacement for the dock wall, this paper analyzed the reasons causing the movement of dock wall in the anchor style dry dock structure from the view of structural design and construction workmanship. Suggestions for improving the structural design and construction measurement are produced.