结合商周高速公路SZTJ6合同段施工实践,介绍了30m预应力连续箱梁预制过程中施工的控制要点,质量控制方法和技术。
Combining with construction practice of section SZTJ6 on Shangzhou Highway, this paper introduces quality control method and technique, key points of prefabricating process of 30m prestressing continuous box beam.
出处
《科学之友》
2007年第10B期57-58,共2页
Friend of Science Amateurs
关键词
30m预制预应力箱梁
桥梁工程
控制要点
30m prefabricated prestressing box beam, bridge project, controlling points