摘要
在分析与工期有关的效益和费用,计算工程网络图时间参数并找出关键线路的基础上,使用线性规划技术对工程项目中各项子工程施工时间进行运筹和优化,可使工程项目总体施工效益达到最大化。
Based on analysis of related costs and social and economic performance of a project, calculation of time parameters of network graph and determination of critical path, LP method was used to coordinate and optimize all of sub-projects so as to maximize project construction performance in its totality.
出处
《上海工程技术大学学报》
CAS
2007年第3期248-251,共4页
Journal of Shanghai University of Engineering Science