摘要 A new grey forecasting model based on BP neural network and Markov chain was proposed. In order to combine the grey forecasting model with neural network, an important theorem that the grey differential equation is equivalent to the time response model, was proved by analyzing the features of grey forecasting model(GM(1,1)). Based on this, the differential equation parameters were included in the network when the BP neural network was constructed, and the neural network was trained by extracting samples from grey system's known data. When BP network was converged, the whitened grey differential equation parameters were extracted and then the grey neural network forecasting model (GNNM(1,1)) was built. In order to reduce stochastic phenomenon in GNNM(1,1), the state transition probability between two states was defined and the Markov transition matrix was established by building the residual sequences between grey forecasting and actual value. Thus, the new grey forecasting model(MNNGM(1,1)) was proposed by combining Markov chain with GNNM(1,1). Based on the above discussion, three different approaches were put forward for forecasting China electricity demands. By comparing GM(1, 1) and GNNM(1,1) with the proposed model, the results indicate that the absolute mean error of MNNGM(1,1) is about 0.4 times of GNNM(1,1) and 0.2 times of GM(I, 1), and the mean square error of MNNGM(1,1) is about 0.25 times of GNNM(1,1) and 0.1 times of GM(1,1). A new grey forecasting model based on BP neural network and Markov chain was proposed. In order to combine the grey forecasting model with neural network, an important theorem that the grey differential equation is equivalent to the time response model, was proved by analyzing the features of grey forecasting model(GM(1,1)). Based on this, the differential equation parameters were included in the network when the BP neural network was constructed, and the neural network was trained by extracting samples from grey system’s known data. When BP network was converged, the whitened grey differential equation parameters were extracted and then the grey neural network forecasting model (GNNM(1,1)) was built. In order to reduce stochastic phenomenon in GNNM(1,1), the state transition probability between two states was defined and the Markov transition matrix was established by building the residual sequences between grey forecasting and actual value. Thus, the new grey forecasting model(MNNGM(1,1)) was proposed by combining Markov chain with GNNM(1,1). Based on the above discussion, three different approaches were put forward for forecasting China electricity demands. By comparing GM(1, 1) and GNNM(1,1) with the proposed model, the results indicate that the absolute mean error of MNNGM(1,1) is about 0.4 times of GNNM(1,1) and 0.2 times of GM(1,1), and the mean square error of MNNGM(1,1) is about 0.25 times of GNNM(1,1) and 0.1 times of GM(1,1).
出处 《Journal of Central South University of Technology》 EI 2007年第5期713-718,共6页 中南工业大学学报(英文版)
基金 Project(70572090) supported by the National Natural Science Foundation of China
关键词 grey forecasting model neural network Markov chain electricity demand forecasting 灰色预测模型 自然网络 电子需求 预测方法
  • 相关文献

参考文献2

二级参考文献18

  • 1.FunahashiK.On the Approximate Realization of Continuous Mapping by Neural Networks[J].Neural Networks, 1989; (2) : 183-192.
  • 2FRANSOO J C. An Aggregate Capacity Estimation Model for the Evaluation of Railroad Passing Constructions[J]. Transportation Research Part A, 2000, (34): 3-49.
  • 3LIU Si-feng, DENG Ju-long.The Range Suitable for GM(1,1)[J].The Journal of Grey System, 1999, 11(1): 131-138.
  • 4DENG Ju-long.Properties of Relational Space for Grey Systems[M].Beijing:China Ocean Press,1988.
  • 5ZHA Jin-mao.Grey Relation Matrix Analysis:Grey Judgement Model[J].The Journal of Grey System,1995,4.
  • 6劳斯SM 何声武 译.随机过程[M].北京:中国统计出版社,1997..
  • 7艾弗列尔M劳 惠益民 译.模拟系统的建模与分析[M].北京:清华大学出版社,1986..
  • 8孙才志,潘俊.修正的灰色预测模型在水文时间序列分析中的应用[J].工程勘察,2000,28(3):23-26. 被引量:9
  • 9陈可,张琴舜,陈培培,蔡日基.BP神经网络在证券分析预测中应用[J].计算机工程,2001,27(11):95-97. 被引量:20
  • 10张飞涟,周继祖.铁路建设项目可持续发展评价[J].铁道学报,2002,24(1):93-96. 被引量:10

共引文献43

同被引文献87

引证文献6

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部