期刊文献+

预处理共轭梯度法在岩土工程有限元中的应用 被引量:5

SSOR-PCG METHOD USED IN SIMULATION OF GEOTECHNICAL ENGINEERING WITH FINITE ELEMENT METHOD
下载PDF
导出
摘要 在岩土工程中进行有限元分析时需要求解大型线性方程组,常用的直接法会占用较大的内存,耗费计算时间较长,计算节点规模有限。用超松弛迭代–预处理共轭梯度法(SSOR-PCG)求解大型稀疏线性方程组,并提出SSOR-PCG法的一套优化内存占用量和计算时间的实现方案。算例结果证明,此方案下的求解器在一台奔腾2.80 GHz主频、1.0 GB内存的个人电脑上,在50 min之内,可求解约30×104节点三维模型的刚度方程,其计算结果也可满足需要。 The solution of a sparse and dense symmetric system of linear equations is essential to finite element simulation in geotechnical engineering.However,the traditional direct method will cost too much memory and calculation time.The paper tries to adopt the successive over relaxation(SSOR)-preconditioned conjugate gradient(PCG) method to solve linear systems and provide a new way to realize the SSOR-PCG method,which can remarkably save the memory and calculation time.In this scheme,the global stiffness is stored in a vector so that the cost of memory is the least.In the same time,the form of preconditioned matrix is changed,which makes it possible store the global stiffness and the preconditioned matrix in the same block of memory on the premise of increasing little extra calculation time.A new method to realize multiplying the global stiffness by a vector is also introduced,and it is found that the time of the iterative operation in any time is reduced greatly.Moreover,the definition of double data structure forms is presented,where the information of global stiffness is stored and this is essential to solve the special problem in rather complex geologic environment.To avoid drastic transformation of the global stiffness caused by the boundary conditions and initial information,an additional information matrix is allocated,and the global stiffness and the global load vector are also changed in accordance with a special rule.By this way,a large account of calculation is avoided on the premise of not influencing the final result.It has been proven by numerical examples that the linear equation solver based on the above improvements shows robust.The solver is able to solve the linear system of 3D structural problems with about 300 000 nodes within 50 minutes on a personal computer with Pentium 2.8 GHz CPU and 1.0 GB memory.
作者 郑超 张建海
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2007年第A01期2820-2826,共7页 Chinese Journal of Rock Mechanics and Engineering
关键词 岩土工程 超松驰迭代法(SSOR) 预处理共轭梯度法(PCG) 线性方程组 geotechnical engineering successive over relaxation(SSOR) method preconditioned conjugate gradient(PCG) method linear equations
  • 相关文献

参考文献15

二级参考文献63

  • 1雷光耀,黄朝晖.ICCG法误差阵模与条件数的估计[J].计算物理,1996,13(4):489-495. 被引量:6
  • 2王勖成.有限单元法基本原理和数值方法[M].北京:清华大学出版社,1991.7.
  • 3[1]Jin J M. The finite element method in electromagnetics[M]. New York: Wiley, 1993.
  • 4[2]Volakis J L, Chatterjee A, Kempel L C. Finite element method for electromagnetic[M]. Pascataway, NJ: IEEE Press, 1998.
  • 5[3]Chen R S, et al. Application of the SSOR preconditioned CG algorithm to the vector FEM for 3-D full-wave analysis of electromagnetic-field boundary-value problems[J]. IEEE Trans on MTT, 2002,50(4):1165-1172.
  • 6[4]Jin J M. Electromagnetic scattering from large deep and arbitrarily-shaped open cavity[J]. Electromagnetics, 1998,18(1):3-34.
  • 7Golub G H, Van Loan C F. Matrix computations 3rd edition[M]. Boltimore and London: The Johns Hopkins University Press, 1996.
  • 8吕涛,区域分解算法-偏微分方程数值解法新技术,1992年,125页
  • 9雷光耀,计算物理,1996年,13卷,489页
  • 10Lei G Y,Int J Computer Math,1994年,50卷,89页

共引文献90

同被引文献60

引证文献5

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部