摘要
检验改造后的3号水轮发电机组在高水头下的稳定性能,并从机组振动摆角角度评价改造后机组的安装质量,并提出了有利于机组稳定运行的建议。
Checking up the stability performance under high water head of retrofitted No.3 generating unit, and evaluating the installation quality from the view of vibration and putting forward proposals favorable to the stable operation of the unit.
出处
《东北电力技术》
2007年第9期1-4,共4页
Northeast Electric Power Technology
关键词
高水头
稳定性
研究
High head
Stability
Research