2AT&T Bell Labs. Telcordia SR-332 Issue2-2006 Telcordia tech- nologies special report:reliability prediction procedure for elec- tronic equipment IS]. Red Bank,New Jersey,USA:Telcordia Technologies, 2006.
3U.S. Department of Defense. MIL-HDBK-217F NOTICE II-1995 Military handbook-reliability prediction of electronic equipment[S]. New York,USA: [s.n.], 1995.
5Siemens. SN29500-1/2/3/4/5/6/7/8/9/10 Failure rate of components[S]. [S.1. ] :Siemens,2004.
6U.S. Department of Defense. 217 PlusTM. Handbook of 217- PlusTM peliability prediction models[SJ. New York,USA: [s.n.], 2006.
7International Electrotechnical Commission. IEC-TR-62380-2004 Reliability data handbook universal model for reliability predic- tion of electronics components,PCBs and equipment IS]. New York, USA : [ s.n. ], 2006.
8Airbus France. FIDES-Guide 2004 Issue A:reliability methodo- logy for electronic systems [ S ]. Doetinchem, Netherlands : FIDES Group, 2004.
9FOUCHER B,BOULLIE J,MESLET B,et al. A review of reliabi- lity prediction methods for electronic devices [J]. Microelectronics Reliability,2002(42) : 1155-1162.
10IEEE Standards Coordinating Committee 37 on Reliability Pre- diction. IEC62059-41-2006 Electricity metering equipment- dependability-reliability prediction[S. New York,USA:IEEE, 2006.