4Goyal S K.On Improving the Single-vendor Singlebuyer Integrated Production-inventory Model with a Generalized Policy[J].European Journal Operational Research,2000,125:429-430.
二级参考文献25
1Lee H, Padamanabhan P, Whang S. The bullwhip effect in supply chain[J]. Sloan Management Review, 1997, 38(3) : 93 -102.
2DEKKER R, et al. A spare parts stocking policy based on equipment criticality [ J ]. International Journal of Production Economics, 1998, (56 -57) : 69 -77.
3Pan C-H J, Yang J S. A study of an integrated inventory with controllable lead time [ J ]. International Journal of Production Research,2002, 40 (5) : 1263 - 1273.
4Huang C K. An integrated vendor-buyer cooperative inventory model for items with imperfect quality [ J ]. Production Planning & Control, 2002, 13 (4) : 355 -361.
5Ouyang L Y, Chen C K, Chang H C. Lead time and ordering cost reductions in continuous review inventory systems with partial backorders[J]. Journal of the Operational Research Society, 1999,50(12) : 1272 -1279.
6Hadley G, Whitin T M. Analysis of inventory systems [ M ].Englewood Cliffs, NJ: Prentice Hall, 1963.
7Goyal S K. A joint economic-lot-size model for purchaser and vendor: A comment[ J]. Decision Sciences, 1988, 19 : 236 -241.
8Lee H L, Billington C. Supply chain management: Pitfalls and opportunities[J]. Sloan Management Review, 1992, 33: 65-73.
9Lee H L, Billington C. The evolution of supply chain management models and practice at Hewlett Packard[J]. Interfaces, 1995, 25(5): 42-63.
10Parlar M, Berkin D. Future supply uncertainty in EOQ models[J]. Naval Research Logistics, 1991, 38: 107-121.