摘要 文章分析了湖州局变电站通信监控系统的现状,在网管系统已实现对所有通信设备实时监控的基础上,重点介绍了利用现有的SDH设备接口实现对通信机房的环境监控方案,并对2种监控改造方案进行了比较,选择低成本、高性能的方案达到了预期的目的,该方案在实际应用中取得了很好的效果。 This paper analyzes the current situation of communication monitoring system in substations in Huzhou Electric Power Bureau. Based on the situation that all the communication equipments have been monitored in real-time by using existingnetwork management system, the paper mainly introduces the upgrading scheme for environmental monitoring in communication equipment room by using SDH interface. Two solutions are compared and the one with higher performance and lower cost is selected. This scheme has achieved good results in practice.
作者 张云峰
机构地区 湖州电力局
出处 《电力系统通信》 2007年第10期62-64,共3页 Telecommunications for Electric Power System
关键词 变电站 通信监控 改造 substation communication monitoring upgrading
  • 相关文献

参考文献2

  • 1陈淑荣.电力通信网计算机监测系统[M].北京:中国电力出版社,1995.
  • 2浙江电网通信站无人值班管理规定[Z].浙江电力调度通信中心.1995.

共引文献3

同被引文献4

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部