用电结构的变化要求大容量机组普遍参与电网调峰。因此,在调峰过程中保证设备的安全是十分重要的问题。本文对开负荷的方式和速率对锅炉过热器安全性的影响进行了研究。
Change of power consumption structure requires most large-capacity units to be in volved in peak load regulation of electricity grid. In this connection, it is important to ensure safety of equipment during peak load reguIation. This paper studies the affect of style and speed of load in crease on boiler superheater safety.
出处
《锅炉技术》
北大核心
1997年第5期25-28,共4页
Boiler Technology